Installation Standards • Alberta

Nova Clad Standards.
Protecting Your Home Like Our Own.

A beautiful exterior is only as dependable as the work beneath it. We plan roofing, siding, stucco and soft-metal installations around Alberta's applicable building requirements, the selected manufacturer's instructions, and careful attention to every detail.

1

Alberta Building Requirements

We reference the code and applicable local requirements for the work being done.

2

Manufacturer Installation Instructions

Each product is installed to its current approved system instructions.

3

Care in Every Layer

Water control, fastening, ventilation, finish and site cleanup all matter.

How we build with confidence

There is more to exterior protection than what you see.

Strong installation starts before the first shingle, siding panel or stucco coat is applied. Materials, substrate condition, moisture management and the details where different surfaces meet are all part of the system.

  1. 01 / ASSESS

    Inspect the Existing Conditions

    We review the condition of the roof deck or wall substrate and identify deteriorated areas, water entry points and conditions that need attention before covering them.

  2. 02 / PLAN

    Match the Correct System

    We confirm the selected product, approved accessories, installation method, roof slope or wall design and relevant code requirements for the specific project.

  3. 03 / PROTECT

    Build the Water-Management Layers

    We pay attention to underlayments, weather-resistive barriers, flashings and drainage paths before installing the visible finish.

  4. 04 / INSTALL

    Follow Product-Specific Fastening

    Fastener type, placement, spacing, penetration and allowance for material movement depend on the selected manufacturer's written instructions.

  5. 05 / DETAIL

    Finish Critical Connections

    Valleys, roof edges, openings, wall transitions, soffits and roof penetrations receive careful detailing for continuity and drainage.

  6. 06 / REVIEW

    Inspect, Clean and Explain

    We review visible work, address outstanding deficiencies, clean the work area and explain relevant care and warranty information at handover.

01 / Residential roofing

A roofing system, not just a layer of shingles.

For IKO and Malarkey shingle installations, the manufacturer's current application instructions guide the products and details we use. Alberta's building requirements and project conditions determine the additional protection required.

Installation checkpoints

  • DECK PREPARATION

    A sound foundation

    Inspect the sheathing, repair damaged or unsound areas within scope, and start on a suitable, dry and secure roof deck.

  • ICE & WATER CONTROL

    Protection beneath the shingles

    Use the specified roof underlayment and eave/valley ice-and-water protection, with laps and coverage suited to slope, product and code requirements.

  • ROOF EDGES & VALLEYS

    Correct flashing and sequencing

    Integrate drip edges, starter courses and valley treatments so water sheds away from vulnerable transitions.

  • NAILING ZONE

    Fasteners in the right place

    Use the correct nail type, count and placement in the designated nailing zone. Additional fastening is used where required by the selected shingle and roof conditions.

  • PENETRATIONS & VENTILATION

    Details that protect the home

    Properly detail plumbing vents, chimneys, skylights, wall intersections, ridge caps and the roof ventilation system.

  • FINAL CHECK

    Inspect every finished section

    Check visible alignment, fastening, edge treatments, flashing, site cleanup and any project-specific workmanship items.

02 / Siding & exterior cladding

Straight lines outside. Smart moisture protection behind.

Whether installing vinyl siding from Gentek, Mitten, Kaycan or Royal Building Products, or a specified fibre-cement (James Hardie) or engineered-wood (LP SmartSide) system, proper installation includes the wall assembly beneath the finish.

Installation checkpoints

  • WALL PREPARATION

    Level and sound surfaces

    Check the substrate, sheathing, supporting structure and any required repairs before new cladding is applied.

  • MOISTURE MANAGEMENT

    Water is directed out

    Install the applicable weather-resistive barrier, flashing and required drainage/air-space details as one coordinated wall assembly.

  • OPENINGS & TRANSITIONS

    Protect the vulnerable areas

    Integrate window and door flashings, kick-out flashings, corners and roof-to-wall details with the drainage plane.

  • FASTENING & MOVEMENT

    Allow the material to perform

    Follow the product-specific fastening schedule, slot placement, approved fasteners and expansion clearances rather than fastening panels too tightly.

  • FINISHED APPEARANCE

    Plumb, level and properly trimmed

    Align starter strips, courses, corners, trim pieces and transitions for a clean, consistent finish.

  • SOFFITS & ACCESSORIES

    Keep the system connected

    Coordinate soffit ventilation, fascia and accessories without blocking required airflow or trapping moisture.

03 / Stucco & exterior finishes

Stucco protection begins before the finish coat.

Traditional cement stucco and engineered EIFS assemblies are different systems. We follow the applicable Alberta cladding and stucco requirements and the selected system supplier's installation details rather than mixing incompatible components.

Installation checkpoints

  • SUPPORT & PREPARATION

    Proper substrates

    Assess the surface and install the approved substrate preparation, lath or specified reinforcing system.

  • WATER CONTROL

    Drainage and flashing

    Coordinate moisture barriers, drainage layers, window flashings and lower termination details where required by the wall assembly.

  • APPLICATION

    The right coats and sequence

    Follow the specified mix, coat thickness, reinforcement, joint details, application conditions and curing requirements for the selected system.

04 / Soft metals & roof drainage

The small metal details make a big difference.

Eavestroughs, downspouts, fascia, soffits and flashings must work with the roof and wall systems to move water away from the home. Explore our soft metals services and the installation resources below.

Installation checkpoints

  • EAVESTROUGHS

    Consistent drainage

    Install compatible, properly supported gutters with slope and outlet placement appropriate for the roof and building conditions.

  • DOWNSPOUTS

    Direct water away

    Provide secure downspout routing and discharge that moves roof runoff away from vulnerable building areas.

  • SOFFIT & FASCIA

    Clean finish, clear airflow

    Securely fasten and align metals while maintaining the intended roof ventilation and protecting exposed edges.

  • FLASHINGS

    Water-shedding transitions

    Use correctly shaped, lapped and integrated flashings at roof edges, walls, penetrations and other interfaces.

  • MATERIAL COMPATIBILITY

    Appropriate fasteners and metals

    Select compatible materials, finishes and corrosion-resistant fasteners as required by the project and product instructions.

  • FINAL REVIEW

    Secure, tidy and functional

    Check supports, seams, outlet connections, water paths, sharp edges and overall finish before handover.

Every project deserves attention

Our four-stage installation review.

A practical workflow to help keep installation details visible, from the original condition of your home to the completed exterior.

  1. 01   BEFORE

    Inspect & agree on scope

    Confirm the existing condition, materials, expected details and any necessary repairs.

  2. 02   DURING

    Check the hidden layers

    Review barrier placement, protection details, deck or wall preparation and fastening practices.

  3. 03   FINISH

    Review workmanship

    Examine visible roof and cladding alignment, flashing, water-management details and cleanup.

  4. 04   HANDOVER

    Explain what was done

    Share relevant product information and available project documentation or warranty details.

Helpful documents from trusted sources

The official codes and installation guides we reference.

The current National Building Code – 2023 Alberta Edition (second printing, published August 2026) is Alberta's building code in force as of this page's preparation. For any job, use the current code, local authority requirements and the manufacturer's exact instructions for the product and installation conditions.

Relevant Part 9 code sections: 9.26 Roofing, 9.27 Cladding and 9.28 Stucco. Refer to the current adopted edition and any applicable STANDATA or project-specific requirements.

Important: This homeowner overview is not a technical specification, installation instruction or substitute for the current Alberta code, applicable permits, local authority requirements, engineered design or manufacturer directions. Actual requirements vary by the product, structure and site conditions. Links to associations and manufacturers are provided for reference and do not imply their endorsement of Nova Clad or of a particular project.

Quality is built into every layer.